Jan 21, 2009

Sept 5 - A bit more digging

After the brief interruption to take down about ten trees the digging for the foundations resumed. Here you can see the small dozer (bigger than the mini dozer used lakeside) working on making room for what will be the mud hall and downstairs laundry/storage area. The canoe had been stored next to the shed and had been moved for tree removal. Oh, and the small tree that can be seen at the corner of the digging.....it's now long gone.







This is one corner of what was dug out for the foundation. The white pipe is part of the line running to the septic field. And yes they broke it while digging. Luckily it was a quick fix. The front one that runs from the bathroom to the septic tank was broken as well. The good news there is that they also fixed the angle of the pipe so all will drain better in the future. Each time I was without water for maybe an hour or so. Not a big deal.

No comments: